Equinor

Reshaping Underwater

Reshaping Underwater

Year

Year

2018/2019

2018/2019

Client

Client

Production

Production

Sound

Sound

Ruben Åeng

Ruben Åeng

Out in the Norwegian Sea, at 300 meters depth, lies the Åsgard Field. Down on the seabed are valuable installations and pipelines that require regular supervision and maintenance. So far, this work has been done manually from ships, a costly, time-consuming and environmentally unfriendly solution.

Out in the Norwegian Sea, at 300 meters depth, lies the Åsgard Field. Down on the seabed are valuable installations and pipelines that require regular supervision and maintenance. So far, this work has been done manually from ships, a costly, time-consuming and environmentally unfriendly solution.

Video poster
Video poster
Video poster
Video poster
Video poster
Video poster